MinRes HQ sets the standard in office fit outs in todays modern world. Complete with a gym, creche, restaurants and all of the mod cons of a high performing office environment.

  • Year

    2022

  • Client

    Mineral Resources (Client)
    Milieu Creative (Designer)
    Altitude Interiors (Installer)
    Barrier Fire Protection (PFP Installer)

  • Location

    Osborne Park, Western Australia

The Challenges

Provide a stunning design that creates that immediate WOW when you walk into a room.  The designers at Milieu Creative selected SAS740 linear baffle ceilings to provide not only a visual impact, but also provide necessary acoustic control for an office environment.  For office areas of the building SAS330 Metal Pan ceiling system was selected.  This system was designed with custom sized tiles to fit the floor layout  and with a superior acoustic performance specification.    The stunning finish on the metal pan ceiling tiles creates a clean aesthetic for a high performance office environment.  Some of the major challenges were:

  • Provide a ceiling design that contributes to employee experience, and leaves a lasting impression
  • Superior acoustic control in all areas, with increased control in meeting rooms and on the executive level
  • Supply the product in a fast efficient manner that kept up to the very tight timeframes for completing this re-fit

The Solutions

System 740 linear baffles where chosen to provide a visual impact that provided neat clean lines.  The design team included acoustic infill tiles to provide sound control, as well as adding to the aesthetic of the baffle ceiling area.  The tiles are easily removable for access to services above for routine maintenance.

In the office areas for the team at MRL, SAS330 metal pan ceiling tiles where chosen in white (RAL 9003), with a perforation pattern of D3343.   This stunning metal pan tile provided a seamless integration when the ceiling transitioned to SAS740 baffle, and into plasterboard.   TRU-SH-150 shadow gap trim from SAS International was chosen for all metal pan ceiling to plasterboard transitions.

Our operations team delivered this project ahead of time, with coordinated deliveries to site and to the clients storage facility.   Our efficient delivery of material ensured work on site was not held up.

World class head quarters

MinRes HQ – Project Overview

MinRes HQ sets the standard in the complete office experience for their staff. This world-class fitout features a gym, restaurants, creche, employee wellbeing areas as well as all of the features you would expect in a modern office. SAS 740 Linear baffle ceiling, complete with acoustic infill tiles was specified for this project as well as PROMASPRAY® P300 vermiculite spray to fire protect kitchen exhaust and CAFCO® 300 vermiculite spray combined with PROMATECT® 250 boards to fire protect steel columns and beams.
Design by Milieu Creative.

Next Look

MinRes HQ – Structural Steel protection

MinRes HQ – Structural Steel protection

CAFCO® 300 vermiculite spray combined with PROMATECT® 250 boards were specified for this project to fire protect steel columns and beams.
Installed by Barrier Fire Protection.

Next Look

MinRes HQ – Ventilation Duct Protection

MinRes HQ – Ventilation Duct Protection

PROMASPRAY® P300 vermiculite spray was specified for this project to fire protect kitchen exhaust.
Installed by Barrier Fire Protection.

Previous Look

MinRes HQ – Structural Steel protection

SAS 740 Baffle Ceiling in Dark Timber effect finish
PROMASPRAY® P300 Fire Protection to Kitchen Exhaust
CAFCO® 300 vermiculite spray combined with PROMATECT® 250 boards for Structural Steel Protection
Look Image
CAFCO® 300 Fire Protection to Steel Beams
PROMATECT® 250 Fire Protection to Steel Columns
Look Image
PROMASPRAY® P300 Fire Protection to Kitchen Exhaust
Look Image

Products featured in this project

Showing 2 Products

Latest Projects

Insights to our Projects

View All Projects
Project Category Image

Metal Ceilings September 04, 2024

Piara Waters Senior High School

Project Category Image

Metal Ceilings June 17, 2024

Long Neck Public House

Project Category Image

Metal Ceilings June 20, 2023

Clough Office Perth