Project Overview

Designed to expand specialist and emergency care facilities, the project demanded high-performance fire protection systems to safeguard essential building services.
Progressive Materials supplied PROMASIL 1100, a high-temperature calcium-silicate insulation board, chosen for its proven ability to maintain circuit integrity and structural stability during extended fire exposure.

  • Year

    2025

  • Client

    St John of God Health Care

  • Location

    Perth

Hospital

The Challenges

Hospitals rely on uninterrupted operation of essential services such as electrical, communication, and control systems, even during fire events. Ensuring these systems remain functional for the full fire-resistance period required a solution that could:

  • Maintain lower internal temperatures than standard fire enclosures
  • Withstand intense thermal loads for up to two hours
  • Comply with stringent AS 3013:2005 and AS 1530.4:2014 Section 12 testing standards
  • Integrate seamlessly within the complex service pathways of a hospital environment

The Solutions

Promat PROMASIL 1100 was selected for its lightweight composition, low thermal conductivity, and proven fire-performance credentials. The system was installed by Property Fire Maintenance as part of a two-hour Circuit Integrity solution, protecting vital electrical circuits from failure under fire conditions.

Through extensive testing to AS 3013:2005 and AS 1530.4:2014 Section 12, PROMASIL 1100 demonstrated the capability to maintain circuit functionality by keeping internal enclosure temperatures below critical limits.

This performance ensures that essential life-safety systems, including alarms, emergency lighting, and communication lines, remain operational long enough to support evacuation and fire-response operations.

The completed installation at SJOG Midland Hospital provides a fully compliant, tested, and durable solution for protecting critical infrastructure. By incorporating PROMASIL 1100 into the design, the project team achieved confidence in the safety and resilience of the building’s essential services -supporting St John of God Health Care’s ongoing commitment to operational excellence and community wellbeing.

SJOG Midland Hospital

PROMASIL 1100 was selected for its lightweight composition, low thermal conductivity, and proven fire-performance credentials.

PROMASIL 1100
Look Image

Latest Projects

Insights to our Projects

View All Projects
Project Category Image

Passive Fire Protection June 25, 2022

MinRes HQ – Passive Fire Protection

Project Category Image

Passive Fire Protection April 23, 2022

One the Esplanade – Fire Penetrations

Project Category Image

Passive Fire Protection January 20, 2022

Transformer Fire Wall in the Pilbara